![NetApp SteelStore 30 Series Owner'S Manual Download Page 30](http://html1.mh-extra.com/html/netapp/steelstore-30-series/steelstore-30-series_owners-manual_1669963030.webp)
Installation
25
Chapter 3
Installation
3.1 Introduction
In this chapter, you are shown how to install the SteelStore into an industry standard 19-inch rack
cabinet.
Note
SteelStore appliances are supplied and delivered fully populated with drive carrier modules pre-
installed.
Warning
The SteelStore appliance is too heavy for a single person to easily install into a rack cabinet with
all its component parts installed.
The following procedures describe the installation of the SteelStore appliance and highlight any critical
requirements and good handling practices that you must follow to comply with the warranty.
Caution
Make sure that you have fitted and checked a suitable anti-static wrist or ankle strap and observe all
conventional ESD precautions when handling SteelStore modules and components. Avoid contact with
the backplane, motherboard, PCI card components, module connectors, and such.
Caution
When connecting the SteelStore system, use only the power cords supplied or cords that match the
specification quoted in section
Summary of Contents for SteelStore 30 Series
Page 3: ......
Page 9: ...NetApp SteelStore Cloud Integrated Storage xx30 Series Hardware Owner s Manual 4...
Page 29: ...NetApp SteelStore Cloud Integrated Storage xx30 Series Hardware Owner s Manual 24...
Page 47: ...NetApp SteelStore Cloud Integrated Storage xx30 Series Hardware Owner s Manual 42...
Page 65: ...NetApp SteelStore Cloud Integrated Storage xx30 Series Hardware Owner s Manual 60...