12
NetApp AltaVault Cloud Integrated Storage Installation and Service Guide for Physical Appliances
Installing the controller chassis and shelves
Installations of controller chassis in two-post racks
Ensure you have the following parts and tools available to mount the controller chassis in a two-post rack:
Two-post telco tray kit:
–
A two-piece telco tray with left and right halves that attach to the back of the equipment rack to support the
back of the controller.
Mid-mount telco kit
–
Two mid-mount mounting brackets
–
Six M5 screws and star washers that attach the mid-mounting brackets to the sides of the controller
Bagged screws in the following sizes for mounting the two-piece telco tray and mid-mount brackets to the rack
–
16 M5-0.8 x 20 Pilot screws
–
16 M6-1 x 20 Pilot screws
–
16 10-32 x.75 Pilot screws
–
16 12-24 x.75 Pilot screws
Note:
You do not need to use all the screws listed. Use the appropriate size screws that match the threading of the holes in your rack.
Installing an AltaVault controller chassis in a two-post rack
Use the instructions that follow to install your controller chassis in a two-post rack.
To install the AltaVault controller chassis in a two-post rack
1.
Record the System Serial Number (SSN) of the controller you are installing.
The SSN label is on the metal lip just below port e0l and the maintenance port (wrench icon) on the controller as
shown in the illustration below. This number is used to uniquely identify the controller in the AltaVault Setup
Wizard during initial system setup.
Summary of Contents for AltaVault Cloud Integrated Storage 4.1
Page 2: ......