![Neptune TRU/FLO Installation And Maintenance Manual Download Page 23](http://html1.mh-extra.com/html/neptune/tru-flo/tru-flo_installation-and-maintenance-manual_1668257023.webp)
Installing the TRU/FLO
TRU/FLO Compound Meter Installation and Maintenance Guide
11
Ensuring Proper Installation
After the TRU/FLO meter is installed, you must carefully fill the meter
with water. Complete the following steps:
1
Make sure the service line has been flushed of any debris before
installing the meter.
2
Turn the bleed screw (located on the cover) counter-clockwise one
3
With the outlet-side gate valve closed, slowly open the inlet-side
valve to pressurize the meter.
4
Turn the air bleed screw (located next to the turbine register) with a
flat screwdriver.
Figure 5 Bleed Screw
5
Close the air bleed screw clockwise when the air is completely
vented.
6
Slowly open the outlet-side gate valve until downstream is
pressurized.
After installation, it is important that the upstream (inlet) valve be put in the
“full open” position during service. A partially throttled upstream valve causes
flow profile distortion which adversely affects meter accuracy.
Summary of Contents for TRU/FLO
Page 2: ......
Page 3: ...TRU FLO Compound Meter Installation and Maintenance Guide...
Page 8: ...Notes Contents vi TRU FLO Compound Meter Installation and Maintenance Guide...
Page 12: ...x TRU FLO Compound Meter Installation and Maintenance Guide Notes Tables...
Page 44: ...Appendix A 32 TRU FLO Compound Meter Installation and Maintenance Guide Notes...
Page 57: ......