E-CODER
®
)R450
i™
Installation and Maintenance Guide
7
Chapter 4: Installing the E-CODER
®
)R450
i
™
This chapter provides instructions for:
l
Storing and unpacking the E-CODER
®
)R450
i
™.
l
Performing preliminary tests.
l
Verifying materials.
l
Selecting a site.
l
Installing the unit.
Prior to Installation
This section defines how to unpack and store the E-CODER)R450
i
prior to installing it.
Inspecting the Unit
After receipt, inspect all shipping containers for damage, and inspect the contents of any
damaged cartons prior to storing.
After completing the inspection, store the cartons in a clean, dry environment. The unit
remains in sleep mode until it is exposed to light.
Unpacking
As with all precision electronic instruments, handle the E-CODER)R450
i
carefully; however,
no additional special handling is required. When shipped, the assembly is lying on its side.
You should lift the assembly out of the box by the meter main case.
After unpacking the E-CODER)R450
i
, inspect it for damage. If the E-CODER)R450
i
appears to
be damaged or proves to be defective upon installation, notify your Neptune Territory
Manager or Distributor. If one or more items require reshipment, use the original cardboard
box and packing material.
Tools Needed
"Tools and Materials" on page 5 shows the recommended tools you need to successfully
install the E-CODER)R450
i
.
Some items may not apply to your specific installation, or the list may not contain all
required tools or materials.
Summary of Contents for E-CODER) R450i
Page 1: ...E CODER R450i Installation and Maintenance Guide...
Page 2: ......
Page 3: ...E CODER R450i Installation and Maintenance Guide...
Page 10: ...This page intentionally left blank ix E CODER R450i Installation and Maintenance Guide Figures...
Page 12: ...This page intentionally left blank xi E CODER R450i Installation and Maintenance Guide Tables...
Page 39: ......