Safety and Preliminary Checks
Observe the following safety and preliminary checks before and during each installation:
l
Verify that you are at the location specified on the Site Work Order.
l
Verify that the site is safe for you and your equipment.
l
Notify the customer of your presence, and tell the customer that you will need access to
the water meter.
l
If the Site Work Order does not have an MIU ID number on it, write the ID numbers of the
E-CODER you are installing. If the Site Work Order already has an MIU ID number on it,
verify that it matches the ID number on the MIU you are installing.
6
E-CODER
®
)R450
i™
Installation and Maintenance Guide
Chapter 3: General Installation Guidelines
Summary of Contents for E-CODER) R450i
Page 1: ...E CODER R450i Installation and Maintenance Guide...
Page 2: ......
Page 3: ...E CODER R450i Installation and Maintenance Guide...
Page 10: ...This page intentionally left blank ix E CODER R450i Installation and Maintenance Guide Figures...
Page 12: ...This page intentionally left blank xi E CODER R450i Installation and Maintenance Guide Tables...
Page 39: ......