Page 2 of 13
Foreword
The purpose of this document is to describe how to install and configure the Neets Control –
SieRRa II, hereafter the SieRRa II.
COPYRIGHT - All information contained in this manual is the intellectual property of and copyright-
ed material of Neets. All rights are reserved. You may not allow any third party access to content,
information or data in this manual without Neets’ express written consent.
CHANGES - Neets reserve the right to change the specification and functions of this product
without any notice. Check www.neets.dk for the latest updated version of this manual.
Questions, AFTER reading this manual, can be addressed to your local distributor or:
Neets A/S
Denmark
by E-Mail: [email protected]
or you may use our contact form at www.neets.dk
Revision list
This document (no: 310-0102-001-009-001) has the following revision changes:
Author: Date
Description
Pages
Rev
MH: 10-06-2015
First release.
All
1.00
What is in the box?
When you open the box it will contain the following items:
SieRRa II, DK
1 x Neets Control - SieRRa II
1 x 12V wall plug PSU
1 x Wall plate
Terminal connectors
1 x Front cover
1 x Paper cover
Quick guide
SieRRa II, EU
1 x Neets Control - SieRRa II
1 x 12V wall plug PSU
1 x Wall plate
Terminal connectors
1 x Front cover
1 x Paper cover
Metal plate
2 x screws for metal plate
Quick guide
SieRRa II, US
1 x Neets Control - SieRRa II
1 x 12V wall plug PSU
1 x Wall plate
Terminal connectors
1 x Front cover
1 x Paper cover
2 x #6-32 screws for mount-
ing in standard US one-gang
electrical wall box or mounting
bracket (“mud ring”)
2 x white headed #6-32
screws for wall plate fixation
Quick guide