Necta Korinto UL Installation, Use And Maintenance Manual Download Page 5

1

© by N&W GLOBAL VENDING SpA

07 06 274 - 00

TABLE OF CONTENTS

English

INTRODUCTION

PAGE 2

IDENTIFICATION OF THE VENDING MACHINE

PAGE 2

IN CASE OF FAILURE

PAGE 2

TRANSPORT AND STORAGE

PAGE 2

POSITIONING THE VENDING MACHINE

PAGE 3

WARNING FOR INSTALLATION

PAGE 3

PRECAUTIONS IN USING THE MACHINE

PAGE 3

WARNING FOR SCRAPPING

PAGE 3

TECHNICAL SPECIFICATIONS

PAGE 3

POWER CONSUMPTION

PAGE 4

ACCESSORIES

PAGE 4

LOADING AND CLEANING

PAGE 5

POWER SUPPLY SWITCHES

PAGE 5

HYGIENE AND MAINTENANCE

PAGE 5

USING THE VENDING MACHINE

PAGE 6

CONTROLS AND INFORMATION

PAGE 6

LOADING COFFEE

PAGE 6

LOADING INSTANT PRODUCTS

PAGE 6

SERVICE FUNCTIONS

PAGE 7

FILLING THE WATER SUPPLY TANK

PAGE 7

CLEANING THE WASTE TRAYS

PAGE 7

DISASSEMBLING AND CLEANING THE MIXERS PAGE 8
CLEANING THE COFFEE UNIT

PAGE 8

SUSPENDING FROM USE

PAGE 8

INSTALLATION

PAGE 9

POWER SUPPLY SWITCHES

PAGE 9

UNPACKING THE VENDING MACHINE

PAGE 9

CONNECTION TO THE WATER MAINS

PAGE 9

CONNECTING TO THE POWER SUPPLY

PAGE 10

INSTALLING THE PAYMENT SYSTEM

PAGE 11

WATER SOFTENER UNIT

PAGE 11

INSERTING THE LABELS

PAGE 11

INITIALISING

PAGE 12

FILLING THE WATER SYSTEM

PAGE 12

OPERATION

PAGE 13

COFFEE DISPENSING CYCLE

PAGE 13

DECAFFEINATED DISPENSING CYCLE

PAGE 14

CHECKING AND ADJUSTING THE MACHINE SETTINGS
PAGE 14
STANDARD SETTINGS

PAGE 14

WATER TEMPERATURE CONTROL

PAGE 15

ADJUSTING THE GRADE OF GRINDING

PAGE 15

ADJUSTING THE COFFEE DOSE

PAGE 15

NOTES ON PROGRAMMING

PAGE 16

POWER ON

PAGE 16

OPERATING MODES

PAGE 16

NORMAL OPERATING MODE

PAGE 16

SURFING MODE

PAGE 17

FILLER MENU

PAGE 17

STATISTICS

PAGE 18

SELECTION PRICES

PAGE 18

CHANGE TUBES CONTROL

PAGE 18

DISPLAYING THE TEMPERATURE

PAGE 18

TEST DISPENSING

PAGE 19

GSM PRE-ALARMS

PAGE 19

EVADTS TRANSFER

PAGE 19

FILLER MENU MASKING

PAGE 19

TECHNICIAN MENU

PAGE 20

FAILURES

PAGE 20

PROGRAMMING PARAMETERS

PAGE 21

STATISTICS

PAGE 25

TEST

PAGE 25

MISCELLANEOUS

PAGE 26

UP-KEY SETUP CONTROL

PAGE 26

UP-KEY STATISTICS CONTROL

PAGE 26

MAINTENANCE

PAGE 27

INTRODUCTION

PAGE 27

BREWER UNIT MAINTENANCE

PAGE 27

SANITISING THE MIXERS AND FOODSTUFF CIRCUITS
PAGE 28
PERIODICAL CLEANING

PAGE 29

PRINTED BOARD FUNCTIONS
AND INDICATOR LAMPS

PAGE 30

ACTUATION BOARD

PAGE 30

PUSH-BUTTON BOARD

PAGE 31

BOILER CONTROL BOARD

PAGE 31

PAYMENT SYSTEMS EXPANSION BOARD

PAGE 31

HYDRAULIC SYSTEM

PAGE 32

PROGRAMMING MENU SUMMARY

PAGE 33

WIRING DIAGRAM

PAGE 87

Summary of Contents for Korinto UL

Page 1: ...INSTALLATION USE AND MAINTENANCE MANUAL MANUEL D UTILISATION INSTALLATION ET ENTRETIEN EN English Pag 1 FR Fran ais Pag 44 Korinto Espresso UL 120V DOC NO H 274V 00 EDITION 1 07 2006...

Page 2: ......

Page 3: ...e identificaci n resulta conforme a las disposiciones legislativas de las directivas 98 37 CE 89 336 73 23 CEE y modificaciones y integraciones sucesivas Declara que o distribuidor descrita na chapa d...

Page 4: ......

Page 5: ...TIALISING PAGE 12 FILLING THE WATER SYSTEM PAGE 12 OPERATION PAGE 13 COFFEE DISPENSING CYCLE PAGE 13 DECAFFEINATED DISPENSING CYCLE PAGE 14 CHECKING AND ADJUSTING THE MACHINE SETTINGS PAGE 14 STANDARD...

Page 6: ...s Before starting installation and using the machine it is first necessarytocarefullyreadandunderstandtheinstructions containedinthismanual astheyofferimportantinformation on installation safety opera...

Page 7: ...e machine is sold without payment system therefore the installer of such system has sole responsibility for any damagetothemachineortothingsandpersonscausedby faulty installation The integrity of the...

Page 8: ...ffee unit ratiomotor Magnets Pump Electric mixers Coffee grinder motor Fuse protection for Main electrical circuit Board power supply transformer CAPACITY OF CONTAINERS POWER CONSUMPTION Themachinepow...

Page 9: ...on the machine to prevent the formation of bacteria At installation the hydraulic circuits and the parts in contact with foodstuff should be fully sanitised to remove any bacteria which might have fo...

Page 10: ...re level is below 70 dB LOADING COFFEE Open the machine top panel lift the coffee container lid and fill the container with coffee ensuring that the shutter is fully open see Fig 5 It is advisable to...

Page 11: ...base cabinet or in any case outside the machine the tank must be cleaned at least once a week Fig 7 CLEANING THE WASTE TRAYS The waste trays can be easily removed even with the door closed see Fig 8...

Page 12: ...fee funnel area see Fig 9 using a brush or a small vacuum cleaner Donotusewatersoggywetclothsforcleaningtheshelves wring them out well before use SUSPENDING FROM USE If for any reason the machine is s...

Page 13: ...the machine top panel a switch disconnects the power allowing loading operations in a safe condition The switch on key MUST NOT be left inside the ma chine it must be kept by the qualified personnel t...

Page 14: ...then tighten again see Fig 13 open the tap and switch the machine on CONNECTING THE MACHINE TO THE POWER SUPPLY The machine is designed to operate under a single phase 120 V voltage and is protected...

Page 15: ...ws at the back of the door and remove the cover Disconnectthekey padcablesfromthepush buttonboard and remove the label support sliding out the tabs from the slots on the door see fig 15 Insert the lab...

Page 16: ...ble languages can be scrolled with the and buttons and the selection is confirmed with button Unless the machine is initialised the language request is not made again In any case it will be possible t...

Page 17: ...opens allowing the pump to push the boiler water onto the coffee for the brewing cycle At the end of the dispensing cycle the purge valve opens and the coffee dose is lightly pressed permitting the di...

Page 18: ...ound coffee in two consecutive cycles leaving un changed the total amount of water for a coffee based selection CHECKING AND ADJUSTING THE MACHINE SETTINGS To get the best results from the product use...

Page 19: ...rinding atleast 3 test selections must be performed in order to check the new grade of grinding for ground coffee The finer the grade of grinding the longer the time neces sary for dispensing the coff...

Page 20: ...rom the programming menu At the end of the power on cycle the display indicates the softwareversionnumber After a few seconds the display shows the message Korinto ES REV 1 0 SELECT THE DRINK DRINK SE...

Page 21: ...gio 3 Pulsante ingresso programmazione 4 Copertura scheda pulsanti Fig 20 FILL STATISTICS FILL Print statistics FILL Display statistics FILL Reset statistics FILLER MENU Whenpressingoncetheprogramming...

Page 22: ...starts blinking Press the confirm button the message Running is displayed for a few seconds and all statistics are reset SELECTION PRICES This function is used for changing the sales price for each si...

Page 23: ...he technician menu FILL GSM FILL Reset pre alarm counters FILL EVADTS FILL Connection FILL TEST FILL Complete selection FILL Water only FILL Powder only N B For espresso coffee based selections only t...

Page 24: ...w is restored Ifthemachineisequippedwithaninternalwatersupplytank the pump will be switched off Air break The machine is locked if after 10 selections the float has never signalled the lack of water V...

Page 25: ...ecting one of the systems it is possible to control its functions Validators When the Validator Lines function line programming of the programming menu is displayed the value of the 6 Validator coin l...

Page 26: ...eforeachproductassignedto such selection WhipperControl The whipping time can be set for each selection button for each water dose that composes such selection The duration can be set in two different...

Page 27: ...rasnotpresentanddisablesthecoffeegrounds counter The float and coffee grounds collection functions are performed by the devices inside the base cabinet Selectioncounter This function is used to lock t...

Page 28: ...he door closed and resetting the counter after replacing the filter Enabling the Filler menu Thisfunctionisusedtodeterminethefillermenuoptionsto be left active or to be disabled The reference numbers...

Page 29: ...a Press the confirm button displaying the blinking mes sage Confirm Press the confirm button the message Running is displayed for a few seconds and all statistics are reset Displayingrelativestatistic...

Page 30: ...the statistics file to the Up Key with all of the statistics files present in that moment in the vending machine indicating the name to be assigned to the file e g Max000 STA Delete This function is u...

Page 31: ...nnelwhohavethespecificknowledgeof the machine functioning from a point of view of elec trical safety and health regulations INTRODUCTION To ensure correct operation for a long period the machine must...

Page 32: ...ers block the disk fitted on the mixer shaft with a finger see Fig 24 then rotate the impeller to undo it Fig 24 Wash all parts with detergent being sure that all visible residue and product layers ar...

Page 33: ...tools if necessary allcomponentsmustbesoakedinasanitisingsolutionfor at least 20 minutes the unit internal surfaces are to be cleaned with the same sanitising solution thoroughly rinse and then reinst...

Page 34: ...for resetting the CPU glows during the board reset the green LED 11 blinking indicates that the microproc essor is working correctly the yellow LED 12 indicates the presence of 5 V DC Fig 26 1 Main sw...

Page 35: ...ecial connector According to the communication protocol used by the payment system the 2 minidips will have to be set to OFF Executive and BDV or to ON MDB Fig 28 1 Selection button connectors 2 Not u...

Page 36: ...out support 2 Flow diverter spout 3 Instant prod mixer 4 Brewing chamber 5 Upper piston 6 Dispensing solenoid valves 7 Purge solenoid valve 8 Check valve 9 Coffee pump 10 Bypass 11 Volumetric counter...

Page 37: ...UP and DOWN The UP and DOWN scrolling buttons are used for moving from one programming menu item to the next one located in the same level and at the same time change the status or the numeric value...

Page 38: ...DISC CNT PRINT 1 1 1 4 FAIL CNT PRINT 1 1 1 5 COIN MECH PRINT 1 1 2 TOTAL PRINTING 1 2 PRINT REL STAT 1 2 1 PARTIAL PRINTING 1 2 1 1 SEL CNT PRINT 1 2 1 2 PRINT BAND CNT 1 2 1 3 DISC CNT PRINT 1 2 1 4...

Page 39: ...Y 1 4 1 3 SEL NO CNT DIS 1 4 2 DISPLAY BAND CNT 1 4 3 DISC CNT DISP 1 4 4 FAIL CNT DISP 1 4 5 COIN MECH DISP 1 4 5 1 AUDIT DATA DISP 1 4 5 2 CASH COUNT DIS 1 5 DELETE REL STAT 1 5 1 PARTIAL RESET 1 5...

Page 40: ...DATA EXIT FUNCTION PREVIOUS FUNCTION INCREASE DATA UNIT 1 NEXT FUNCTION DECREASE DATA UNIT 1 by N W GLOBAL VENDING SpA 07 06 274 00 36 Filler Menu Summary 5 TEST 5 1 COMP DISPENSING 5 2 WATER ONLY 5 3...

Page 41: ...SET INDIV PRICE 2 1 1 1 1 PRICE BAND 0 2 1 1 1 2 PRICE BAND 1 2 1 1 1 3 PRICE BAND 2 2 1 1 1 4 PRICE BAND 3 2 1 1 1 5 PRICE BAND 4 2 1 1 2 SET GLOB PRICES 2 1 1 2 1 PRICE BAND 0 2 1 1 2 2 PRICE BAND...

Page 42: ...EL VALVE SETTING 2 2 2 SET POWDER 2 2 2 1 POWDER DOSES 2 2 2 2 DOSER SETTING 2 2 3 SELECTION STATUS 2 2 4 SEL BUTTON 2 2 5 CHECK NO SELEC 2 3 MACHINE PARAM 2 3 1 BOILER TEMPERAT 2 3 2 TANK 2 3 3 ENAB...

Page 43: ...NG 2 5 3 1 SELECTION ENABL 2 5 3 2 DOSE VARIATION 2 5 3 3 PRICE VARIATION 2 5 4 MILD 2 5 4 1 SELECTION ENABL 2 5 4 2 DOSE VARIATION 2 5 4 3 PRICE VARIATION 2 5 5 POWDER COFFEE 2 5 5 1 SELECTION ENABL...

Page 44: ...PWD AZZ CONTAT 2 6 3 4 PWD JUG FACILITY 2 6 3 5 PWD FREE VENDING 2 6 3 6 PWD BLOCCO TAST 2 6 3 7 PWD LAVAGGI 2 6 3 8 PWD SEL PROVA 2 6 3 9 PWD RESET FILTRO 2 6 3 A PWD LEFT S SUP 2 6 4 ENABLE FILL MEN...

Page 45: ...DISC CNT RESET 3 3 1 3 FAIL CNT RESET 3 3 1 4 COIN MECH RESET 3 3 2 TOTAL RESET 3 4 DISP REL STAT 3 4 1 SEL CNT DISP 3 4 1 1 CNT DIS X S SEL 3 4 1 2 TOT CNT DISPLAY 3 4 1 3 SEL NO CNT DIS 3 4 2 DISPLA...

Page 46: ...ND CNT 3 7 1 3 DISC CNT PRINT 3 7 1 4 FAIL CNT PRINT 3 7 1 5 COIN MECH PRINT 3 7 2 TOTAL PRINTING 3 8 PRINT REL STAT 3 8 1 PARTIAL PRINTING 3 8 1 1 SEL CNT PRINT 3 8 1 2 PRINT BAND CNT 3 8 1 3 DISC CN...

Page 47: ...NIT 1 43 Technician Menu Summary 5 MISCELLANEOUS 5 1 D A REGISTRY 5 1 1 INSTALL DATE 5 1 2 PROG M C CODE 5 1 3 OPER CODE ENTRY 5 2 INITIALISING DB 5 3 EVADTS 5 3 1 CONNECTION 5 4 UPKEY 5 4 1 SETUP MAN...

Page 48: ...WITCH IPC FULL CAPSULES CONTAINER SWITCH IPF WASTE CONTAINER OVERFLOW SWITCH IPV1 DISPENSING COMPARTMENT SWITCH IVA EMPTY BOILER MICRO SWITCH KC1 COFFEE BOILER CUTOUT KS1 SAFETY CUTOUT LCD LIQUID CRYS...

Page 49: ...by N W GLOBAL VENDING SpA NOTE...

Page 50: ...N W GLOBAL VENDING S P A Sx44100...

Page 51: ...Korinto ES UL 120V...

Page 52: ...by N W GLOBAL VENDING SpA NOTE...

Page 53: ...by N W GLOBAL VENDING SpA NOTE...

Page 54: ...by N W GLOBAL VENDING SpA NOTE...

Page 55: ...in part nor be transmitted to third parties without the written permit of the Manufacturer who has the sole ownership Le fabricant se r serve le droit de modifier sans pr avis les caract ristiques des...

Page 56: ......

Reviews: