8.
Hold open the Sub-Cover of the KSU, and fasten two screws to mount the KSU.
Sub-Cover
Two screws
Figure 2-52 KSU Mounting on Battery Box
2.7 IP4WW-Battery Box to KSU Connection
To avoid damage to equipment, do not install the Topaz Battery Box
(DX2E-32i/NX7E Battery Box) to the SL1000 system.
• Make sure the system power is off.
• If Expansion KSU(s) are installed, turn the power on/off in the order of
Expansion 3 KSU, Expansion 2 KSU, Expansion 1 KSU and then Main
KSU.
1.
Power off the KSU and disconnect AC cord.
2.
Open the Sub-Cover of the KSU.
Push to hold
Open
Sub-Cover
Figure 2-53 Sub-Cover Open and Hold
SL1000
ISSUE 3.0
2-36
Installation
Summary of Contents for SL1000
Page 1: ...Hardware Manual A50 031170 001 GE ISSUE 3 0 November 2012...
Page 12: ...MEMO SL1000 ISSUE 3 0 x Hardware Manual...
Page 16: ...MEMO SL1000 ISSUE 3 0 R 4 Regulatory...
Page 126: ...MEMO SL1000 ISSUE 3 0 3 8 System Start Up...
Page 140: ...MEMO SL1000 ISSUE 3 0 4 14 Maintenance...