![background image](http://html1.mh-extra.com/html/nec/sl1000/sl1000_hardware-manual_3880327064.webp)
2.
Loosen two screws and remove the L-Bracket.
Two screws
(M4 X 8)
L-Bracket
Figure 2-49 Removing the L-Bracket
3.
Turn the L-Bracket upside down.
Rotate the L-Bracket 180 degrees so that the upper FACE as shown in
is located at the bottom as shown in
Figure 2-50 Securing the L-Bracket
4.
Insert tabs on Battery Box into holes on L-Bracket.
Secure the L-Bracket to the Battery Box using two screws.
5.
Using two screws (M4x8), secure the WM Hook to the L-Bracket.
SL1000
ISSUE 3.0
2-34
Installation
Summary of Contents for SL1000
Page 1: ...Hardware Manual A50 031170 001 GE ISSUE 3 0 November 2012...
Page 12: ...MEMO SL1000 ISSUE 3 0 x Hardware Manual...
Page 16: ...MEMO SL1000 ISSUE 3 0 R 4 Regulatory...
Page 126: ...MEMO SL1000 ISSUE 3 0 3 8 System Start Up...
Page 140: ...MEMO SL1000 ISSUE 3 0 4 14 Maintenance...