4-26 Configuring Your Server
The table below shows the operation when the AC power to the server is turned off once and then
back on, in accordance with the [AC LINK] setting.
Setting of AC LINK
System status before AC power off
Stay Off
Last State
Power On
Operating Off
On
On
Aborting (DC power being off also)
Off
Off
On
Forced
shutdown
Off Off On
* Press the power switch continuously for four seconds or longer. This forcibly turns off the
power.
IMPORTANT:
To turn on the server from the UPS (Uninterruptible
Power Supply), select [Server] - [AC LINK] - [Power On].
Summary of Contents for NEC Express5800 Series
Page 20: ...Notes on Using Your Server 1 3 3 5 inch disk model ...
Page 87: ...3 24 Setting Up Your Server This page is intentionally left blank ...
Page 268: ...6 14 Installing and Using Utilities Windows Server 2003 ...
Page 296: ...7 14 Maintenance This page is intentionally left blank ...
Page 350: ...8 54 Troubleshooting When you use a remote console 6 Each tool is selected and it starts ...
Page 438: ...9 82 Upgrading Your Server This page is intentionally left blank ...
Page 450: ...C 2 IRQ This page is intentionally left blank ...
Page 474: ...D 24 Installing Windows Server 2008 R2 4 Activate Windows The Windows activation is complete ...
Page 504: ...E 28 Installing Windows Server 2008 4 Activate Windows The Windows activation is complete ...
Page 564: ......
Page 566: ...H 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Page 576: ...I 10 Accessing Power and Performance Data This page is intentionally left blank ...
Page 580: ...J 4 Product Configuration Record Table This page is intentionally left blank ...