1. Turning on the Server
Express5800/T110f-S User’s Guide
109
Chapter 3 Setup
1.
Turning on the Server
Turn on the server by using the following procedure.
Important Wait for at least 10 seconds before turning on the server again after the
power has been turned off.
1. Disconnect Flash FDD if applicable.
2. Turn on the peripheral devices such as display unit.
Note
If the power cord is connected to power control system such as an Uninterruptible
Power Supply (UPS), make sure that the power control system is turned on.
3. If POWER LED lights amber, wait until POWER LED is unlit.
4. Press POWER Switch at the front of the server.
POWER LED is turned on green and after a while, the
NEC logo appears on the display.
While the NEC logo is being displayed, the
self-diagnostic program (POST) runs and diagnoses
the hardware. For details, see
Chapter 3
(
1.1 POST
).
POWER
LED
POWER
Switch