22
CHAPTER 2 INSTALLATION PROCEDURE
<5> Removal of rubber of top cover
After removing the top cover, remove the rubber.
<6> Insert the IE-784000-R-EM + IE-784915-R-EM1 into the 2nd slot and 3rd slot, put the top cover, and replace
the screws.
Figure 2-5. Insertion of IE-784000-R-EM in IE-784000-R
IE-784000-R-EM (2nd slot)
IE-784915-R-EM1 (3rd slot)
IE-784000-R-BK (performance board) (4th slot)
IE-784000-R-BK (event trace board) (5th slot)
Supervisor board (fixed)
Power supply switch
Summary of Contents for IE-784915-R-EM1
Page 2: ...2 MEMO...
Page 6: ...6 MEMO...
Page 11: ...VOLUME 1 IE 784915 R EM1 I O EMULATION BOARD 11...
Page 12: ...12 MEMO...
Page 18: ...MEMO 18...
Page 24: ...MEMO 24...
Page 28: ...28 CHAPTER 3 SETTING OF USER CLOCK MEMO 28...
Page 30: ...MEMO 30...
Page 38: ...MEMO 38...
Page 40: ...MEMO 40...
Page 41: ...VOLUME 2 EP 784915GF R EMULATION PROBE 41...
Page 42: ...42 MEMO...
Page 48: ...MEMO 48...
Page 58: ...MEMO 58...
Page 64: ...MEMO 64...