![background image](http://html.mh-extra.com/html/nec/express5800-120ed/express5800-120ed_user-manual_251180040.webp)
2-12
Setting Up the System
Powering On Your System
Power on your system as follows.
1.
Make sure all external devices, such as a video display, keyboard, and
mouse have been connected, and the power cords are connected.
2.
Power on the video display and any other external devices.
3.
Press the push-button power on/off switch on the front panel. Verify that the
system power-on LED is lit. See Figure 2-5 for the location of the power-on
LED.
Note:
The server management logic on your system
board monitors and logs system voltage changes. When
powering up or down your system you may experience a
1–5 second delay from the time you press the push-button
power on/off switch on the front panel and your system
powering down. This is normal system operation and is
required by the server management logic.
After a few seconds your system begins the internal Power-On Self Tests
(POST). POST automatically checks the system board, CPU module, memory,
keyboard, and most installed peripheral devices.
!
CAUTION
Always allow POST to complete before powering down your
system.
If you have problems powering on your system, refer to
Problem Solving
in
Chapter 5 of this User’s Guide.
After you have successfully powered on your system, insert the
E
XPRESS
B
UILDER
CD-ROM into the CD-ROM device, reboot the system and
follow the screen prompts to run E
XPRESS
B
UILDER
.
Summary of Contents for EXPRESS5800/120Ed
Page 1: ... U s e r s G u i d e EXPRESS5800 120Ed ...
Page 2: ...xxx ...
Page 3: ... U s e r s G u i d e EXPRESS5800 120Ed ...
Page 8: ...vi Contents Standard Configuration A 3 RAID Configuration A 5 Glossary Equipment Log Index ...
Page 28: ......
Page 94: ......
Page 116: ......
Page 122: ......
Page 132: ......
Page 137: ...xx ...
Page 138: ... 456 01527 N00 ...