![background image](http://html.mh-extra.com/html/nec/express5800-120ed/express5800-120ed_user-manual_251180031.webp)
Setting Up the System 2-3
Unpacking the System
!
WARNING
Your system weighs approximately 45 pounds (20.41 kg). If
your system contains numerous optional boards and
peripheral devices, it will weigh more. To avoid personal
injury, make sure you have someone help you lift or move
the system.
When you receive your system, inspect the shipping containers prior to
unpacking. If the shipping boxes are damaged, note the damage, and if possible,
photograph it for reference. After removing the contents of the containers, keep
the cartons and the packing materials. If the contents appear damaged when you
unpack the boxes, file a damage claim with the carrier immediately.
Rack-Mount Subsystem Assembly
This section provides the instructions for assembling the rack-mount server unit
into a standard EIA 19-inch rack cabinet. Select an appropriate location in your
rack cabinet for the rack-mount server unit. To improve rack stability, mount
heavier items towards the bottom of the rack cabinet.
!
CAUTION
Ensure that the location of the rack-mount server unit does
not create an unstable condition when installed in the rack
cabinet.
Note:
When planning your system configuration for the
rack cabinet you should consider the length of the cables
that interconnect system components.
Summary of Contents for EXPRESS5800/120Ed
Page 1: ... U s e r s G u i d e EXPRESS5800 120Ed ...
Page 2: ...xxx ...
Page 3: ... U s e r s G u i d e EXPRESS5800 120Ed ...
Page 8: ...vi Contents Standard Configuration A 3 RAID Configuration A 5 Glossary Equipment Log Index ...
Page 28: ......
Page 94: ......
Page 116: ......
Page 122: ......
Page 132: ......
Page 137: ...xx ...
Page 138: ... 456 01527 N00 ...