
Using the EISA Configuration Utility
NCR S26 Hot Plug Server User Guide
5-15
6. Select “Step 2: Add or remove boards” and press Enter to display the
screen as shown in the figure below.
Figure 5-7. Add or Remove Boards
Step 2: Add or remove boards
Listed are the board and options detected in your computer.
Press F10 when you have completed this step.
Press INSERT to add the boards or options which could not be
detected or which you plan to install.
Press DEL to remove the highlighted board from your configuration.
Press F7 to move the highlighted board to another slot.
Add = INSERT
<Remove = DEL>
<Move = F7>
<Done = F10>
System
EISA 1
EISA 2
EISA 3
PCI 1
PCI 2
PCI 3
PCI 4
PCI 5
Embedded PCI SCSI Controller
Embedded PCI VGA Controller
NCR 3426 Dual Pentium System
(Empty)
(Empty)
(Empty)
(Empty)
(Empty)
(Empty)
(Empty)
(Empty)
The screen contains the configuration data that the ECU read from your
CFG file. It includes the number of EISA slots and device controllers
detected.
7. If you want to add or have already added a board, highlight a slot and
press Insert to select an option from the list that displays.
8. Press F10 when done.
9. Follow steps 4 to 13 in the “Configuring Your Computer Initially” section
to complete your configuration.
Summary of Contents for S26
Page 1: ...BST0 2140 4700 12 97 NCR S26 Hot Plug Server User Guide Release 3...
Page 11: ...NCR S26 Hot Plug Server User Guide 1 1 Chapter 1 Installation and Documentation Overview...
Page 19: ...NCR S26 Hot Plug Server User Guide 2 1 Chapter 2 Using System Features...
Page 33: ...NCR S26 Hot Plug Server User Guide 3 1 Chapter 3 Adding and Replacing Components...
Page 52: ...Installing Drives 3 20 Adding and Replacing Components Figure 3 10 Securing the Drive...
Page 56: ...Installing Drives 3 24 Adding and Replacing Components...
Page 57: ...NCR S26 Hot Plug Server User Guide 4 1 Chapter 4 Using the BIOS Setup Utility...
Page 91: ...NCR S26 Hot Plug Server User Guide 5 1 Chapter 5 Using the System Utilities...
Page 109: ...NCR S26 Hot Plug Server User Guide A 1 Appendix A 420 Watt Power Supply Requirements...
Page 112: ...Output Requirements A 4 420 Watt Power Supply Requirements...
Page 113: ...NCR S26 Hot Plug Server User Guide B 1 Appendix B Error Messages...
Page 119: ...NCR S26 Hot Plug Server User Guide C 1 Appendix C Sample Configurations...
Page 141: ...NCR S26 Hot Plug Server User Guide D 1 Appendix D Hot Plug Backplane...
Page 161: ...NCR S26 Hot Plug Server User Guide E 1 Appendix E System Support Log...
Page 188: ...Software Records E 28 System Support Log This page intentionally left blank...
Page 219: ...Index NCR S26 Hot Plug Server User Guide Index 3 V Ventilation 2 7...
Page 220: ...Index Index 4 NCR S26 Hot Plug Server User Guide...