background image

Remote Scale Display Mount (NCR 7895 Scanner/Scale)

9

d. Install the Scanner Top by sliding it toward the Tower Frame.

e. Connect cables to designated ports on the Display.

11. Install the Terminal Display to the Tower Frame, by doing the following:

a. Align hooks in mounting bracket to the holes in the Tower Frame and slide

down the Display to lock in place. Align hooks of Mounting Bracket at the back
of the Terminal Display to the holes in the Tower Frame and then slide down the
Display to lock in place.

Summary of Contents for 7357-K912

Page 1: ...Kit Instructions Remote Scale Display Mount NCR 7895 Scanner Scale 7357 K912 Issue A...

Page 2: ...ht notice must be included It is the policy of NCR Corporation NCR to improve products as new technology components software and firmware become available NCR therefore reserves the right to change sp...

Page 3: ...i Revision Record Issue Date Remarks A July 2021 First Issue...

Page 4: ...ii...

Page 5: ...cale Display Mount NCR 7895 Scanner Scale to the NCR FastLane SelfServ Checkout 7357 R6LN Plus Kit Contents Part Number Description 497 0529324 SSCO R6LN 7895 Scanner Remote Scale Display Mount Kit 49...

Page 6: ...7895 Scanner Scale follow these steps 1 Shut down the NCR FastLane SelfServ Checkout software and hardware systems 2 Remove the Terminal Display by doing the following a Remove two 2 screws that are s...

Page 7: ...ount NCR 7895 Scanner Scale 3 c Lift and tilt the Display forward as shown in the image below d Disconnect the Display cables 3 Open the Core Door 4 Remove the Scanner Top by sliding it forward as sho...

Page 8: ...Frame by removing four 4 nuts Note Remove the nuts from the inside of the Tower Frame and discard the Blank Plate properly Retain the four 4 nuts for installing the Remote Scale Display Mount 6 Secur...

Page 9: ...rt the Remote Scanner Display Cable into the Cable Access Hole of the Remote Scale Display Mount and route it to the hole going down the back of the Core Cabinet as shown in the image below 8 Secure t...

Page 10: ...unt NCR 7895 Scanner Scale 9 Route the Remote Scale Display Cable to the Scanner Bucket Note Secure the Remote Scale Display Cable with the 7895 Scanner Scale Cable and the Color Camera Cable to the a...

Page 11: ...Remote Scale Display Mount NCR 7895 Scanner Scale 7 10 Install the NCR 7895 Scanner Scale by doing the following a Connect all the cables on the designated ports on the NCR 7895 Scanner Scale...

Page 12: ...8 Remote Scale Display Mount NCR 7895 Scanner Scale b Place the Scanner Scale in the Scanner bucket c Lower the Scale Plate...

Page 13: ...s on the Display 11 Install the Terminal Display to the Tower Frame by doing the following a Align hooks in mounting bracket to the holes in the Tower Frame and slide down the Display to lock in place...

Page 14: ...ount NCR 7895 Scanner Scale 12 Secure the Terminal Display to the Tower Frame using two 2 screws 13 Ensure that the devices are working properly by powering up the NCR FastLane SelfServ Checkout softw...

Reviews: