Installing the System Piping
3.1.3 Space Heating System Piping
When connecting the space heating system, follow these guidelines:
Ɣ
Carefully tighten all connections to avoid damage to fittings.
Ɣ
After installing the boiler, check the space heating system's operation and inspect for leaks.
Pump Specifications
Model
Temp. Rise
Pump Model
Grundfos
Taco
Bell & Gossett
Armstrong
NFB-301C
20°F
UPS26-150
2400-60
NRF-36
E8.2
25°F
UPS26-150
0013
NRF-36
E7.2
35°F
UPS26-99
0010
NRF-36
E7.2
NFB-399C
20°F
UPS26-150
2400-60
NRF-45
E11.2
25°F
UPS26-150
0013
NRF-45
E8.2
35°F
UPS26-99
0010
NRF-36
E7.2
Note
If you are not using one of the pumps listed in the above tables, use a pump with an integral check valve or install a check valve at
the pump outlet. Refer to the performance curve on page 25 to select a pump that suits your application. The dry contacts on
the boiler can supply up to a maximum of 5A current at the boiler pump connection terminal.
Summary of Contents for NHB Series
Page 120: ...120 Appendixes 12 6 Component Assembly Diagrams and Part Lists 12 6 1 Case Assembly NFB 301C...
Page 122: ...122 Appendixes 12 6 2 Case Assembly NFB 399C...
Page 124: ...124 Appendixes 12 6 3 Heat Exchanger and Waterway Assembly NFB 301C...
Page 126: ...126 Appendixes 12 6 4 Heat Exchanger and Waterway Assembly NFB 399C...
Page 128: ...128 Appendixes 12 6 5 Combustion Parts Assembly NFB 301C...
Page 131: ...131 Appendixes 12 6 6 Combustion Parts Assembly NFB 399C...
Page 134: ...Memo...