21
Installing the System Piping
Air Vent
The Navien NFB boiler comes with an air vent and an adapter
bushing that must be connected to the air vent connection. The
vent efficiently removes the air from the space heating system.
The following figure illustrates an example of a typical air vent
installation.
Note
Install the pressure relief valve onto the adapter before
the air vent. The pressure relief valve may interfere with
the air vent if not installed first.
Return
Air Vent
Bushing
Air Vent
Pressure
Relief Valve
Supply
Note
After installing the air vent bushing to the air vent
connection and inserting the PRV-air vent adapter into
the air bushing, install the provided clip between the
air vent bushing and the PRV-air vent adapter to secure
the adapter to the fitting.
Clip
PRV-Air Vent
Adapter
2
1
3
Air Vent
Bushing
PRV-Air Vent
Connection
Note
To apply the supply top piping, install a tee to the air
vent connection and connect a double nipple to the
tee and the air vent bushing.
Supply
Return
Tee
Pressure
Relief Valve
Air Vent Bushing
Double Nipple
Auto
Air
Vent
<Supply Top / Return Top>
Pressure
Relief Valve
Auto Air Vent
Supply
Return
<Supply Bottom / Return Top>
Note
Use the supplied caps with gaskets to close off any
unused supply or return connections.
Summary of Contents for NHB Series
Page 120: ...120 Appendixes 12 6 Component Assembly Diagrams and Part Lists 12 6 1 Case Assembly NFB 301C...
Page 122: ...122 Appendixes 12 6 2 Case Assembly NFB 399C...
Page 124: ...124 Appendixes 12 6 3 Heat Exchanger and Waterway Assembly NFB 301C...
Page 126: ...126 Appendixes 12 6 4 Heat Exchanger and Waterway Assembly NFB 399C...
Page 128: ...128 Appendixes 12 6 5 Combustion Parts Assembly NFB 301C...
Page 131: ...131 Appendixes 12 6 6 Combustion Parts Assembly NFB 399C...
Page 134: ...Memo...