81
Installing a Cascade System
Note
●
To add additional sub water heater
at a later time, repeat step 3.
●
To cancel the cascade
communication settings, on the
main NCB-H boiler panel, press the
Back button (
) and the Menu
button (
) simultaneously for
3 seconds, and then select
“4. Cascade Status and Set”. Then,
select “2. Cascade System Removal”
and select “YES”. The water heaters
will revert to independent operation.
To reassign the main NCB-H boiler,
repeat steps 1-5.
3. On the sub NPE-A2 water heater panel, press
and hold the OK button ( ) for 3 seconds on
the sub unit. Then, the
ID 1. Allocated!
message
will appear on the sub unit’s front panel display.
When the water heater is set to a sub unit, the
icon will appear on the display.
4. Repeat step 3 to configure the rest of the sub
water heaters in the system.
5. On the main NCB-H boiler panel, press the
Command dial (
)
button when the following screen appears. All
the display screens on the configured water
heaters will return to the temperature display.
Summary of Contents for NCB-190/060H
Page 141: ...141 Appendixes 12 6 4 Fan Gas Assembly 10 9 12 8 7 3 1 2 4 5 6 13 11 11 14 15...
Page 143: ...Memo...
Page 144: ......