79
Installing a Cascade System
If Recirculation Return Line Is Not Installed
Install a NaviCirc valve at the furthest fixture from the water heaters as illustrated below and set the internal
2-way valve on the 1st NPE “A2” unit to the “Ext” position. Refer to the NaviCirc and NPE-A2 Installation Manuals
for additional details. The NCB-H boiler should be set to Combi Pre-heat Mode.
Domestic
Cold
Water
Supply
<NPE-A2>
Ball
Valve
Solenoid
valve
Pressure
Relief Valve
Faucet
Check
Valve
Sub1
<NPE-S2>
Sub2
<NPE-S2>
Sub3
Heating
Supply
Heating
Return
Hydronic
Feed
Water
Expansion
Tank
NaviClean
(Recommended)
Pump
Air Separator with
Expansion Tank
Optional System
Temperature Sensors
Domestic Hot Water Supply
Note
The HotButton mode cannot be used in cascade systems.
Summary of Contents for NCB-190/060H
Page 141: ...141 Appendixes 12 6 4 Fan Gas Assembly 10 9 12 8 7 3 1 2 4 5 6 13 11 11 14 15...
Page 143: ...Memo...
Page 144: ......