100 Installation Checklist
Venting the boiler
Yes
No
Is the vent termination at least 12 in (300 mm) above the exterior grade?
Have you ensured that sufficient make-up air is available?
Is the total vent length within the maximum vent length restriction?
Connecting the Power Supply
Yes
No
Is the supplied voltage 110-120V AC?
Is the boiler plugged into a properly grounded outlet?
If you have made a direct power supply connection, have you installed a power switch to
facilitate end-user maintenance?
Have you checked the polarity of the electrical connection?
PCB DIP switch setting (DIP SW 2, set of 8)
Yes
No
Gas type: Is switch #1 set correctly for LP (ON) or NG (OFF)?
If continuous boiler operation is required, is switch #7 in the up (ON) position?
If high temperature venting has been installed (CPVC or polypropylene), is switch #8 in the up
(ON) position?
Operating the boiler
Yes
No
Have you shown the owner how to clean the inlet water filter?
Have you given the Installation & Operation Manual and User’s Information Manual to the
owner for future reference?
Have you shown the owner how to shut off the gas in case of an emergency?