48 Connecting Electrical Supplies
9.6 Connecting Applications to AC Application Part (With Junction Box)
9.6.1 Connecting the Junction Box Connection (S Plan)
The boiler is designed to be connected to a junction box (S Plan). The Junction box cables are connected to the terminals 1-5 of the
CONM4 in the AC application part and the CONZ3 (POWER OUT) in the AC power line part.
2-Port Zone Valve
Motor
2-Port Zone Valve
Motor
1
2
3
4
5
6
7
8
9
10
HTG
HW
Wiring
Centre
Grey
Grey
Orange
Orange
Brown
Blue
Green/Yellow
Brown
Blue
Green/Yellow
1
2
3
4
1
2
3
Cylinder Stat
1
2
C
Room Stat
2
1
3
$0/.
$0/; 108&3065
Boiler
Terminal
Block
CH_ON
DHW_ON
DHW_OFF
Switched
Live
CH_ON
DHW_ON
DHW_OFF
Switched Live
L
N
PE
L
N
PE
AC Application and
AC Power Line Parts
L
5
L
Summary of Contents for LCB700-21RS
Page 78: ...78 Appendices 13 2 2 Burner Cover Flame Tube...
Page 92: ...Memo...
Page 93: ...Memo...
Page 94: ...Memo...
Page 95: ......