36 Flue System
6.2.2 Vertical Coaxial Removal (Type C
33
)
Standard Removal System
Ø80/125 => Max. length: A=70 m
Ø60/100 => Max. length: A=21 m
A
A
Extended Removal System
Ø80/125 => Max. length: A+B-(1 x 45°elbow) = 70-1 = 69 m
Ø60/100 => Max. length: A+B-(1 x 45°elbow) = 21-1 = 20 m
A
B
Minimum 350 mm
Pipe Diameter
(mm)
Maximum
Length (m)
Elbow
Equivalent
Length (m)
Ø60/100
21
45°
1.0
Ø80/125
70
6.3 Measuring Flue Length
The gas removal and air intake systems may be oriented in any
direction (north, south, east or west). Some special components
such as elbows are used to help reach certain positions. Each
removal terminal kit includes an adapter for connection to the
boiler and a removal terminal.
The total length of the tubes must not exceed the maximum
value defined. If the removal installation includes elbows while
calculating the total length you must take into account that each
elbow has a resistance equal to a specific linear Leq equivalent
length (see table).
Carefully study the diagrams representing the different types of
removal and select the one that best suits the conditions of your
installation. To choose the removal accessories required for each
installation, see the list of accessories on the NAVIEN price list.
Maximum Total Length
Type
Pipe Diameter
(mm)
Orientation
Maximum
Length (m)
Coaxial
Ø60/100
Horizontal
20
Vertical
21
Ø80/125
Horizontal
68
Vertical
70
Equivalent Length of Elbows and Adapters
Type
Pipe Diameter
(mm)
Elbow
Equivalent
Length (m)
Coaxial
Adapter
Ø60/100 ->
Ø80/125
-
0.5
Ø60/100
45°
1.0
90°
1.3
Ø80/125
45°
1.0
90°
2.2
Summary of Contents for LCB700-21RS
Page 78: ...78 Appendices 13 2 2 Burner Cover Flame Tube...
Page 92: ...Memo...
Page 93: ...Memo...
Page 94: ...Memo...
Page 95: ......