42 Connecting Electrical Supplies
9.2 About the Main Controller (PBA)
Refer to the following illustration for the main controller (PBA) wiring description.
a
b
c
d
e
f
h
i
j
k
g
Part
Ref
Applications
AC application
a
System/Combi: Internal recirculation pump Regular: External recirculation pump
b
Combi: 3 Way Valve (Internal) System/Regular: DHW Valve (S,Y plan)
c
System/Regular: CH Valve (S, Y, W plan)
d
Junction box connection
1. CH_ON 2. DHW_ON 3. DHW_OFF 4. AC Thermostat (Switched Live) 5. L
Note
The AC Thermostat (Switched Live) and L terminals must be shorted using a jumper.
AC power line
e
Power S/W
f
Power out: CONZ3 (Connected to the wiring centre)
g
Power in: CONZ1 (AC Power supply)
1. Live (L) 2. Neutral (N) 3. Earth (PE)
Note
The power cord is connected to the CONZ1
(POWER IN) port by default.
DC application
h
Outdoor temp sensor
i
CH thermostat
j
Cylinder stat
k
OpenTherm
Summary of Contents for LCB700-21RS
Page 78: ...78 Appendices 13 2 2 Burner Cover Flame Tube...
Page 92: ...Memo...
Page 93: ...Memo...
Page 94: ...Memo...
Page 95: ......