Page 2-28
NX200 Main-Standby Transmitter System Instruction Manual
Issue 0.3
Section 2 Preparation for Use and Installation
Figure 2-8: Lifting the Dry Cooler (shown in shipping crate)
(d) Attach the resistor assembly on the main unit (see Appendix), noting it is secured to a
round flange on the soda load using eight large bolts.
(e) Unpack the plumbing kit (see Table 2-5 to determine the kit number) and
assemble/install between load and dry cooler (see Figure 2-9). This should be performed
by a licensed plumber. Refer to the Plumbing Installation Tasks (section 2.4) of the Soda
Load manual in Appendix B.
Lift from side; leave
in shipping crate
Summary of Contents for NX200
Page 2: ......
Page 12: ......
Page 16: ......
Page 21: ......
Page 24: ......
Page 26: ......
Page 30: ......
Page 49: ......
Page 50: ...Antenna Tuning Unit Ground Switch Views Issue 0 3 Not to Scale Figure 2 11 Page 2 35 ...
Page 51: ...Antenna Tuning Unit Safety Screen Views Issue 0 3 Not to Scale Figure 2 12 Page 2 36 ...
Page 55: ......
Page 66: ......
Page 70: ...Trip Circuit for Breaker Panel s Main Breaker Issue 0 3 Not to Scale Figure 2 24 Page 2 56 ...
Page 74: ......
Page 80: ......
Page 97: ......