User Manual / CONVERTISS FOLDING PREMIUM
Made by NAUSICAA Medical S.A.S. / Approved by Ghizlane Labrosse (Biomedical Engineer)
16
If you think that there might be a damage or a functional problem, the bed must not be used at all and
it must be immediately disconnected from the power supply until the damaged components have been
totally replaced or repaired!
23
If you think that there might be a damage or a functional problem, the bed
must not be used at all and it must be immediately disconnected from the
power supply until the damaged components have been totally replaced or
repaired!
The pages below can be used as an inspection protocol.
Sheet 1 of 2
Client/ Medical Centre/ Surgery:
Address:
Task carried out:
Testing of the bed
Testing before the first use of the bed
_____________________________________________ Testing after repair / maintenance
Device type:
Nursing Bed
Protection class:
I
Bed type:
Inventory number:
Place:
Serial number:
Manufacturer: Apollo Healthcare Technologies Ltd.
Parts used: none
Equipment used (Type/ number of inventory):
1.
Classification according MPG: class I
2.
I. Visual inspection
ok
not
ok
Problem
description
Visual inspection of electrical components
Identification labels and stickers
In place and clearly readable
Housing of the control device
Properly positioned, damages
Housing and lifting tubes of the
motors
Properly positioned, damages
Hand control
Damages
Power cable of the motors, hand
control cable
Properly positioned, damages
Connector and clamp of the
controller
Properly positioned
Visual inspection of mechanical components
Identification labels and stickers
In place and clearly readable
Lifting Pole
Damages, deformations
Bed frame
Damages, deformations
Metal mattress platform
Damages, chips
Wheels
Damages
Mattress base
Damages, deformations
11
The main control box comes already attached to the
knee break actuator with all the cables for the
actuators and the handset connected.
The knee break actuator should be mounted under
the bed frame so that the motor end (the end where
the cables connects to the actuator) is towards the
centre of the bed and the extending ram of the
actuator is connected to the moving knee break
section of the mattress platform.
In order to insert the securing pin into the end of the
extending ram you need to manually lift the knee
break and pull out the ram so that it is away from the
control box it is attached to, allowing you to insert the
locking pin. Please see image to the left.
The backrest actuator should then be mounted under the bed frame again so that the
motor end is towards the centre of the bed and the extending ram is connected to the
moving back rest section of the mattress platform.
Ensure all mounting pins are fully inserted through the bed frame mounting points on both
sides of the actuator and the spring loaded locking loops are in the closed position.
All the cables should be already attached to the control box and numbered 1 – 4 with a
tag on the opposite end where they connect into each actuator. The number inside the
control box (re circles above) should correspond with the same number on the other end
of each cable.
Number 1 cable should be connected into the backrest actuator.
Number 2 cable should be connected into Hi-Lo actuator at the foot end of the bed.
Number 3 cable should be connected into the backrest actuator.
Number 4 cable should be connected into the Hi-Lo actuator at the head end of the bed.
Pay attention to position the back and foot rest actuators correctly! They should
never be inverted.
6.2 By the owner
The owner of this nursing bed is required to carry out regular tests in case of any new installation, any maintenance
service and during the normal use operations to ensure the safety of this bed.
These tests must be verified during the regular maintenance services depending on use conditions.
• The functional tests, the evaluations, the documentation of the inspection results must be carried out only by expe-
rienced personnel who have the appropriate knowledge and in conditions necessary to implement the correct testing.
• The testing evaluation and the documentation of the results must only be performed only by skilled electricians with
additional appropriate medical and technical knowledge.
• Thetest must be carried out according to the sequence below:
1. Visual inspections
2. Electrical measurements
3. Functional tests
Frequency of the inspections
As a benchmark, we recommend that a full examination is conducted at least every year. This can be extended to a
maximum of two years in accordance with the terms of use on your own responsibility reflecting a proven fault rate in
this time of 2%.
The pages below can be used as an inspection protocol.
6. MAINTENANCE