NI VirtualBench Calibration Procedure
15. Disconnect all connections and connect Channel -25 V to Volts HI, and GND to Volts LO
as shown in Figure 31. Connect GND and Common Floating GND with a jumper.
Figure 31.
Cable Connections For -25 V Voltage Programming Accuracy Verification
16. Repeat steps 4 through 11 for the
ps/-25V
channel.
17. Disconnect all connections.
18. Call
PS Close
.
1
VirtualBench DC Power Supply
2
DMM