background image

©

 National Instruments Corporation

3

SCXI-1314 Universal Strain Terminal Block

Connecting the Signals 

To connect the signal to the terminal block, perform the following steps, 
referring to Figures 1 and 2 as necessary:

Figure 1.  

SCXI-1314 Parts Locator Diagram

1.

Unscrew the top cover screws and remove the top cover.

2.

Loosen the strain-relief screws and remove the strain-relief bar.

3.

Run the signal wires through the strain-relief opening. You can add 
insulation or padding if necessary.

4.

Prepare your signal wire by stripping the insulation no more than 
7 mm.

5.

Connect the signal wires to the screw terminals by inserting the 
stripped end of the wire fully into the terminal. No bare wire should 
extend past the screw terminal. Exposed wire increases the risk of a 
short circuit that can cause circuit failure.

When connecting your signals to the SCXI-1314, follow the labeling 
on the SCXI-1314, as indicated in Figure 2.

1

Top Cover Screws

2

Top Cover

3

Thumbscrew

4

Mating Connector

5

Strain-Relief Bar

6

Strain-Relief Screws

7

Safety-Ground
Lug

2

7

1

4

3

5

6

Reviews: