
Index
©
National Instruments Corporation
I-5
launching VIs at system startup, 5-6, 5-10
Publish Data VI, 3-23
runaway startup applications, C-4
serial VIs, 3-23
specifying download path, 5-6
specifying target with command line
LabWindows/CVI software, 3-18
LED indicators, 4-4
power-on self test (POST), 2-15, 4-5
LINK LED, 4-5
local bus connector, protective cover (figure),
M
100 Mbps LED, 4-5
memory specifications, E-1
modules.
See
FP-20
xx
hardware; I/O modules
monitoring I/O channels, 3-14
mounting hardware on DIN rail.
See
installation, mounting hardware on DIN rail
mounting hardware to a panel.
See
installation,
mounting hardware to a panel
N
National Instruments
calibration certificate, F-2
customer education, F-1
Declaration of Conformity, F-1
professional services, F-1
system integration services, F-1
technical support, F-1
worldwide offices, F-2
network module.
See
FP-20
xx
hardware
network security settings, 3-12
network specifications, E-1
network watchdog, 4-1
network.
See
Ethernet network
O
online technical support, F-1
OPC client, 3-19, 3-20
OPC server, 3-19, 3-20
overview
xx
setup, 1-4
using FP-20
xx
P
panel mount.
See
installation, mounting
hardware to a panel
password, locking/unlocking configuration in
password-protected resets, 3-4, B-1
phone technical support, F-2
physical characteristic specifications, E-2
pollution degree, 2-2
power connections
calculating power for FieldPoint
POWER LED, 4-4
power requirement specifications, E-1
power supply, 2-13
power-on self test (POST), 2-15, 4-5
power-up
launching LabVIEW RT applications at