MAINTENANCE
36
407170_ROGUE_RevA
MAINTENANCE SCHEDULE
MAINTENANCE TO BE PERFORMED
SERVICE INTERVAL
Daily
Monthly
Every
500 hrs
Every
1000 hrs
Inspect wheels, tooling holder, blade holder, handle harness and power cord
for damage. Check for loose or missing fasteners.
●
Clean built-up glue and debris from wheels, wheel cleaners, front weight,
deflector and blade holder.
●
Test E-stop and lanyard kill switch for proper functioning.
●
Test GFCI for proper functioning.
●
Inspect linear actuator foam pads and wear liners for excessive wear.
Replace as needed.
●
Remove wheel coupling flanges and clean any built-up debris.
●
Inspect isolators. Replace as needed.
●
Inspect and grease cutting head bearing. Replace as needed.
●
Inspect blade angle linkage for excessive play. Grease linkage.
●
To ensure the machine operates safely for a long time, perform regular maintenance according to the following schedule.
To avoid personal injury:
●
Always turn off machine, disconnect from power and discharge stored energy before performing maintenance.
Variable frequency drives (VFDs) hold stored energy and pose a serious electrical shock hazard. Always per-
form the following procedure before beginning any work on the machine:
1.
Turn off machine.
2. Leave power cord plugged in 5 minutes.
3. Disconnect power cord.
4. Wait an additional 5 minutes before beginning any work.
WARNING
REASSEMBLING COMPONENTS
Use of threadlocker on fasteners is recommended when reassembling components after performing maintenance.