4.6 Initial commissioning
Narda
FieldMan
27
4.6
Initial commissioning
4.6.1
Switch on the device
The device is switched on via the
Power
key on the left side of the housing.
⇒
Press
Power
key for > 1 s to switch on the device.
↳
After the system start, the device is ready for operation.
During initial commissioning, then change the following settings if necessary:
• The language of the interface
• Local time
• Time zone (with GNSS option)
• Country of use (for WiFi/Bluetooth option)
4.6.2
Selecting the language of the interface
1.
Press
SK4
to open the device settings.
2.
Under
GENERAL SETTINGS
>
Language
, select the language
).
4.6.3
Setting the local time and time zone
1.
Press
SK4
to open the device settings.
2.
Under
POSITION AND TIME
>
DATE / TIME
>
Time
, set the time,
under... >
Time Zone
, set the time zone (see
.
NOTICE
Damage to a device covered in dew during commissioning
A device stored or transported at low temperatures may become covered in dew
when brought into a warm room. If it is put into operation in this condition, it may
be damaged.
⇒
To prevent damage, wait until all dew on the surface of the device has evaporated.
⇒
The device is not ready for operation until it has reached the operating range of ‒20
to +50 °C.
Summary of Contents for FieldMan
Page 1: ...FieldMan Measurement Device for Electromagnetic Fields User manual...
Page 6: ...6 FieldMan Narda...
Page 10: ...1 About this product 10 FieldMan Narda...
Page 14: ...2 General safety instructions 14 FieldMan Narda...
Page 30: ...5 Controls and display elements 30 FieldMan Narda 5 1 Controls 2 3 4 5 6 1...
Page 90: ...8 Operating modes 90 FieldMan Narda...
Page 108: ...10 Cross mode functions 108 FieldMan Narda...
Page 112: ...11 PC software and updates 112 FieldMan Narda...
Page 120: ...13 Conformity 120 FieldMan Narda...
Page 125: ......