EN
W415-2899 / A / 10.07.20
25
installation
7.1 brick (all)
1.0 Place the standoff in the framed
opening, using the tabs as guides.
2.0 Secure the standoff to the sheathing
using the 8 long screws (supplied in
brick standoff kit). The screws should
penetrate through the sheathing and
into the wall framing.
!
WARNING
If the thickness between the brick surface and sheathing exterior exceeds 4”, the brick
must
be installed after
installing the brick standoff and
BEFORE
installing the termination. The termination cap will then secure to the
surface of the brick and secure to the brick standoff. For non-standard brick sizes, it is recommended to either use a
custom built brick standoff or mount the termination on the surface of the brick
Silicone
3.0 Attach the termination to the venting,
see “pre-installation” and “venting”
sections.
Silicone
Brick Standoff
Terminal
X 4
note:
Diagrams are for illustrative
purposes only. Installation must
comply with all local codes.
Refer to “venting requirements” and “venting installation” sections in
your appliance installation manual.
• Terminal (ST47U)
• Brick Standoff (SOST47B)
Required for 4”7”:
• Terminal (ST58U-1)
• Brick Standoff (SOST58B)
Required for 5”/8”:
note:
All inner flex pipe and outer flex pipe
joints to the termination may be sealed
using high temperature red RTV silicone
W573-0002 (not supplied) or the high
temperature sealant W573-0007 Mill
Pac (not supplied). However, the high
temperature sealant W573-0007 Mill Pac
(not supplied) must be used on the joint
connecting the inner flex pipe and the
exhaust flue collar of the appliance.
4.0 Install the termination and venting from
the outside of the building, bringing the
venting through the opening in the wall.
5.0 Slide the terminal return flange over
the standoff and secure with 4 short
screws (supplied in standoff kit).
6.0 Apply a bead ofs clear silicone to seal
the edges of the termination.
7.0 Finish around the brick standoff and
termination with brick.
X 8