![NAMCO CRISIS ZONE DX Operator'S Manual Download Page 44](http://html1.mh-extra.com/html/namco/crisis-zone-dx/crisis-zone-dx_operators-manual_3163040044.webp)
Page 43
4-4
Fitting the Coin Tower Assy
1.
Position the Coin Tower Assy against the Joint Box.
2.
Remove 6off security screw (M5x15), unlock the lock and remove the Joint Box
Cover.
3.
Connect all connectors.
4.
Fit 4off hex head screws (M8x20) to retain the Coin Tower to the Joint Box.
5.
Refit and lock the Joint Box Cover and refit the 6off security screw (M5x15)
Hex head screw
(M8x20)
Connectors
Coin Tower
Joint Box
Hex head screw
(M8x20)
Summary of Contents for CRISIS ZONE DX
Page 83: ...Page 82 1 13 14 5 9 7 6 10 8 17 18 15 4 2 16 3 12 11...
Page 88: ......