Summary of Contents for 500 MK2
Page 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Page 8: ...8 ...
Page 9: ...Setup Setting up the boat after purchase or long time storage ...
Page 10: ...1 Basic platform assembly ...
Page 11: ...11 ...
Page 20: ...2 Basic mast assembly ...
Page 21: ...21 21 ...
Page 29: ...3 Mainsail setup ...
Page 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Page 32: ...4 Jib setup ...
Page 36: ...5 Rudders ...
Page 42: ...6 Trapeze setup ...
Page 47: ...7 Cunningham system ...
Page 49: ...8 Spinnaker system ...
Page 64: ...Rigging Rigging the boat to get ready for sailing ...
Page 65: ...65 ...
Page 66: ...9 Setting the mast ...
Page 75: ...10 Mainsail rigging ...
Page 80: ...11 Jib rigging ...
Page 88: ...12 Spinnaker rigging ...
Page 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Page 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Page 97: ...After Sails Storage Maintainance and Repairs ...
Page 103: ...103 13 NOTES ...