12
.
1.1.
Beam assembly threaded
Tools needed:
- Torque wrench
- 5/16 or 8 mm hex socket
- Grease
Take time to align the crossbars !
1.
8x
8x
1x
1x
2x
8x
Steel
Glassfiber
1x
1x
2.
3.
500 mk2
1.
Space the hulls aproximately 2.5m
parralel from each other. Use the
cardboard cradles or cattrax to support
the hulls.
2.
Place both crossbars.
3.
Insert all beam bolts
before tensioning.
Grease the bolts using
the supplied grease.
Summary of Contents for 500 MK2
Page 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Page 8: ...8 ...
Page 9: ...Setup Setting up the boat after purchase or long time storage ...
Page 10: ...1 Basic platform assembly ...
Page 11: ...11 ...
Page 20: ...2 Basic mast assembly ...
Page 21: ...21 21 ...
Page 29: ...3 Mainsail setup ...
Page 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Page 32: ...4 Jib setup ...
Page 36: ...5 Rudders ...
Page 42: ...6 Trapeze setup ...
Page 47: ...7 Cunningham system ...
Page 49: ...8 Spinnaker system ...
Page 64: ...Rigging Rigging the boat to get ready for sailing ...
Page 65: ...65 ...
Page 66: ...9 Setting the mast ...
Page 75: ...10 Mainsail rigging ...
Page 80: ...11 Jib rigging ...
Page 88: ...12 Spinnaker rigging ...
Page 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Page 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Page 97: ...After Sails Storage Maintainance and Repairs ...
Page 103: ...103 13 NOTES ...