
57.
5.4.
Spinnaker halyard cleat on mast
1.
Install the spinnaker cleat base on the mast. With the long end
pointing down.
2.
Install the 40mm carbo pivoting lead block. The cleat is facing
downwards the sheave is facing down.
3.
If the cleat is not facing down.
• You can unmount the cleat
• Turn it around
• And remount the cleat.
1.
Tie a 15mm ring to one end of the shockcord.
2.
Feed the shockcord from above through the eyelet
located on the side of the trampoline.
3.
Pull the shockcord to the other side and feed it through
the eyelet from below.
4.
Attach a 15 mm ring to the end of the shockcord.
shockcord
5.3.
Spinnaker sheet rings trampoline
2x
15mm
2x
Summary of Contents for 500 MK2
Page 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Page 8: ...8 ...
Page 9: ...Setup Setting up the boat after purchase or long time storage ...
Page 10: ...1 Basic platform assembly ...
Page 11: ...11 ...
Page 20: ...2 Basic mast assembly ...
Page 21: ...21 21 ...
Page 29: ...3 Mainsail setup ...
Page 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Page 32: ...4 Jib setup ...
Page 36: ...5 Rudders ...
Page 42: ...6 Trapeze setup ...
Page 47: ...7 Cunningham system ...
Page 49: ...8 Spinnaker system ...
Page 64: ...Rigging Rigging the boat to get ready for sailing ...
Page 65: ...65 ...
Page 66: ...9 Setting the mast ...
Page 75: ...10 Mainsail rigging ...
Page 80: ...11 Jib rigging ...
Page 88: ...12 Spinnaker rigging ...
Page 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Page 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Page 97: ...After Sails Storage Maintainance and Repairs ...
Page 103: ...103 13 NOTES ...