63.
6.6.
Spinnaker furler
1.
Lay the continous furlingline out as shown in the
overview. make sure that the furler is facing upwards.
2.
Take the fairlead of the cleat using a T20 torx bit.
3.
Lay the inboard furling rope in the cleat and remount
the fairlead.
2x
shockcord
15mm
Parts: furler bottom with furling rope and rings, cleat with
mounting plate, shockcord furler cord
4.
Mount the cleat on starboard using the mounting plate.
Make sure the cleat is parallel to the front crossbar before
tightening the screws.
5.
Knot the shockcord for the furler rope to the ring on the
furler rope.
6.
Feed the other end of the shock cord through the
second-most aft eye in the hiking strap.
7.
Feed it through a lashing aft. And back to the eyelet on
the side of the trampoline.
8.
Knot this end to the other ringon the furling line.
9.
Temporarily stow the furler bottom away in the
trampoline bag.
Summary of Contents for 500 MK2
Page 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Page 8: ...8 ...
Page 9: ...Setup Setting up the boat after purchase or long time storage ...
Page 10: ...1 Basic platform assembly ...
Page 11: ...11 ...
Page 20: ...2 Basic mast assembly ...
Page 21: ...21 21 ...
Page 29: ...3 Mainsail setup ...
Page 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Page 32: ...4 Jib setup ...
Page 36: ...5 Rudders ...
Page 42: ...6 Trapeze setup ...
Page 47: ...7 Cunningham system ...
Page 49: ...8 Spinnaker system ...
Page 64: ...Rigging Rigging the boat to get ready for sailing ...
Page 65: ...65 ...
Page 66: ...9 Setting the mast ...
Page 75: ...10 Mainsail rigging ...
Page 80: ...11 Jib rigging ...
Page 88: ...12 Spinnaker rigging ...
Page 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Page 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Page 97: ...After Sails Storage Maintainance and Repairs ...
Page 103: ...103 13 NOTES ...