North American Clutch & Driveline
Rockford, Illinois
Phone: (800) 383-9204
(815) 282-7960
Fax (815) 282-9160
www.naclutch.com
81
81
final Assembly And lubrication
11. Install the power take-off according to instructions in the Installation section of this manual.
12. Adjust the clutch according to Clutch Adjustment in the Maintenance section of this manual.
13. Fill the main bearing cavity with grease or oil according to lubrication specifications in
the Maintenance section and Filling the Main Bearing Cavity during initial assembly in the
Description and Specifications section of this manual.
14. Lubricate the remainder of the PTO according to lubrication specifications in the Description
and Specifications section of this manual.
15. Place the instruction cover plate (45) in position on the housing and secure with 2 hex-head
cap screws 5/16” - 18 x 1/2” (46). Torque the capscrews to the proper specifications given in
Torque Values for Fasteners in the Description and Specifications section.
16. Place the bottom cover plate (62), if used, in position on the housing and secure with 2 hex-
head cap screws 5/16” - 18 x 1/2" (74). Torque the capscrews to the proper specifications given
in Torque Values for Fasteners in the Description and Specifications section.
17. Install the shaft key (34) and all parts previously removed from the output end of the clutch shaft.