Troubleshooting
52
zappi
operation and installation manual
Troubleshooting
Symptom
Cause
Solution
Display is blank
-
There is no power to the
unit
-
Check for correct supply voltage at the
supply screw terminals (220 - 260V AC)
In ECO+ mode, the charge
does not start, the display is
always showing
Waiting for
Surplus
and the export power
is 0W
-
Grid Sensor incorrectly
installed
-
Faulty Grid Sensor
-
No signal from
harvi
(if
used)
-
Check the grid sensor is connected to a CT
terminal in the
zappi
or any CT input in the
harvi
-
Check the Grid CT sensor is installed on the
correct cable (see CT Sensor Installation on
page 47)
-
Check resistance of the sensor - it should be
around 200
Ώ
when not connected (remove
the sensor from the cable before testing
resistance)
-
If using
harvi
, check that the CT input has
been set to Grid in the
harvi
settings (under
Linked Devices / Devices in the
zappi
Advanced Settings menu)
In ECO+ mode, the charge
does not start, the display is
always showing
Waiting for
Surplus
, yet the export power
is showing correctly
-
Export Margin set too
high
-
Check Export Margin setting (default is 0W)
Generation power is always
0kW
-
Generation CT not
installed
-
Install generation sensor and connect to
one of the CT inputs
-
Alternatively, if there is no Generation CT,
the Generation and House consumption
figures can be hidden on the main screen by
changing the Icons setting in the Settings /
Display & Sound menu
Installation Limit !
displayed
Display will show the phase(s)
that is(are) overloaded and the
prospective current that would
be drawn if the
zappi
were
allowed to start charge at the
minimum current
-
The measured Grid
Current is greater than
the Grid Limit set in the
zappi
-
Check the Grid Limit setting
-
Reduce the load in the property
-
In a three phase installation, consider
rebalancing the property load across the
three phases
Installation Limit !
CT displayed
-
The Grid CT has become
disconnected or is not
clamped correctly around
the grid supply cable
-
Check CT is installed correctly.