my!
WIND
Ltd.
Soola 1a
51013 Tartu, Estonia
Email: [email protected]
Website: www.mywind.ee
4 |
P a g e 2 6 / 0 7 / 2 0 1 9
1. Introduction
Overview of the my!Wind 10 kW turbine installation with a 10 m self-standing mast on a foundation
block is given in this document. The manual is solely intended to be used for a tower corresponding
with appendix 01 and for a foundation corresponding with appendix 02. Please DO NOT attempt to
use the manual for any other configuration of my!Wind products or for any products provided by other
suppliers. This can result in serious harm or loss of life.
Carefully read and understand the disclaimer at the beginning. While simple in concept, the
installation requires basic mechanical knowledge and attention to detail. Tools listed to erect the
turbine are readily available in most parts of the world or can be obtained from a distributor. When
even remotely possible use a my!Wind distributor who has received a corresponding training to carry
out the installation for you.
2. Prior to installation
2.1 Important safety instructions
1)
Read, understand and follow all warnings.
2)
Install foundation and tower in accordance with the electric code used in your country or region
and all local building and zoning codes and requirements.
3)
Obtain building and construction permits prior to starting the installation.
4)
Make sure that you have enough space for the erection before installing the foundation.
5)
Foundation concrete must be completely cured prior to installing tower (Minimum 20 MPa, 28
day strength).
6)
my!Wind uses high voltage and is potentially dangerous. Follow all safety precautions at all
times.
7)
Remain at a safe distance when rising and lowering tower. NEVER stand or walk under tower
while it is being raised or lowered.
8)
Be aware of overhead power lines.
9)
Do not attempt to raise tower on a windy day (maximum wind speed 5 m/s).
10) Always wear personal protection equipment
– closed toe shoes, work gloves, safety glasses and
hardhat.