my!
WIND
Ltd.
Soola 1a
51013 Tartu, Estonia
Email: [email protected]
Website: www.mywind.ee
12 |
P a g e 2 6 / 0 7 / 2 0 1 9
3. Place the mast tripod or wooden pallets with a height of 0,75 m underneath the 2
nd
segment
approximately 4,5 m from the foundation edge (see Figure 7).
4. Lower the tower 2
nd
segment onto the tripod or pallets and release the lifting equipment.
! IMPORTANT:
Make sure that the segment is securely supported and shall not fall over.
Figure 7
– Supporting the 2
nd
segment
Step 4: Placing the gin-pole
1. Place the gin-pole hinge pipes between tower 1
st
segment hinge (see Figure 8).
2. Once the gin-pole hinges and tower 1
st
segment hinge are coaxial, place the M27 x 500
threaded bar through the hinges.
3. Place A 28 washers onto both ends of the threaded bar.
4. Place M27 nuts onto both ends of the threaded bar and fix them by hand only.
5. Lay the gin-pole a rest on the tower 1
st
segment.
Figure 8
– Placing the gin-pole