AMO R - AMO RR - AMO SV - AMO XT PINION - AMO RR PINION
manual for use and maintenance
EN - 47
6.1.b Checks after every use of the bi-
cycle
Check the following parts:
- the first step is to carry out a general clean
-
ing of the bicycle (especially if used on par-
ticularly dirty and/or muddy surfaces)
- wheels spokes
- wear and concentricity of the rims
- possible damages and foreign bodies on
the tires
- operability and wear status of the hydraulic
brakes (check for possible leakage)
- verification of the wear status of the belt
ATTENTION
The missed or wrong execution
of the inspections and the lack
of repair of the damages follow-
ing falls or accidents may lead to
dangerous riding situations, falls
and accidents.
6.2 PERIODIC
MAINTE-
NANCE PROGRAM
After the first month of operation or after
travelling from 300 to 500 Km
Check the wear status of the following parts:
- toothed belt
- pulleys
- rims
- brake discs
- check correct tightening of all the screws.
Every 500 Km (PINION)
- Check the status of the gearbox sheaths
and cables.
- Clean and grease the gearbox pulley.
After six months or after travelling 3.000
Km
In addition to the points listed above, check
the following parts:
- hub
- steering group
- pedals
- tubes
Every 10,000 Km or every year (PINION)
- Replace gearbox oil.
NOTE: for additional information regarding
the “PINION” gearbox, refer to the relative
manual supplied with the bike.
Bici ELETTRICA_03-2022.indd 47
Bici ELETTRICA_03-2022.indd 47
15/06/2022 17:08:19
15/06/2022 17:08:19