Donning
STEP
1 Suit preparation prior to donning
a) Loosen the neck seal completely.
b) Ensure that the wrist, thigh and ankle adjustment straps are fully loosened.
c) Make sure that the chest zipper is fully opened.
d) Unzip and fold back the chest ventilation zippers to expose the waterproof
zipper. (refer to page 13 for regular zipper maintenance)
e) Fully open the waterproof zipper.
CAUTION
USE EXTREME CAUTION WHEN DONNING THE MSD901. PRIOR TO DONNING THE
MSD901, REMOVE ALL RINGS, WATCHES, EARRINGS, NECKLACES AND EYEGLASSES
THAT WILL CAUSE DAMAGE TO WRIST AND NECK SEALS.
STEP
2 Donning instructions
a) Pick up the MSD901 and fold the top
forward, over the waist.
b) Slowly slide your legs in until your toes
reach the end of the socks (see figure 13).
c) Gently push one hand through the wrist
seal using the index finger of the opposite
hand to stretch the seal as you push your
hand through. Repeat for the opposite
hand. Flatten any folds or rolls of the seal
against the skin (see figure 14).
d) Bring the upper portion of the suit over
your head, aligning the neck opening with
the top of the head. Reach inside the top
of the neck seal with the fingers and gently
pull the seal outward and down as you
push your head through. Flatten any folds
or rolls of the seal against the skin.
FIGURE 13
Inserting Legs Into the MSD901
Industrial Immersion Work Suit
7
Summary of Contents for MSD901
Page 1: ...MSD901 Industrial Dry Suit User s Manual ...
Page 2: ......