1
01
2
05
05
3
05
Overview
Branch Joints
Recommended Outdoor Unit Combination
3.1
3.2
3.3
06
06
07
15
Overview
Choose and Prepare the Installation Site
Select and Prepare the Refrigerant Piping
Select and Prepare the Electrical Wiring
4.1
4.2
4.3
4.4
4
2.1
2.2
2.3
2.4
2.5
03
04
04
04
04
Overview
Unbox the Outdoor Unit
Taking Out Accessories of Outdoor Unit
Pipe Fittings
Remove the Protect Board
1.1
1.2
1.3
01
01
03
Meaning of Various Labels
What the Installation Operator Must Know
Important Information for User
OVERVIEW
ABOUT THE PACKING BOX
ABOUT THE OUTDOOR UNIT COMBINATION
PREPARATIONS BEFORE INSTALLATION
30
30
31
Overview
Dial Switch Settings
Digital Display and Button Settings
6.1
6.2
6.3
6 CONFIGURATION
35
35
35
Overview
Things to Note During Test Run
Checklist before Test Run
7.1
7.2
7.3
7 COMMISSIONING
17
17
18
19
22
22
23
24
24
25
Overview
Open the Unit
Outdoor Unit Installation
Pipe Flushing
Pipe Welding
Gas Tightness Test
Vacuum Drying
Piping Insulation
Refrigerant Charging
Electrical Wiring
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5 OUTDOOR UNIT INSTALLATION
INSTALLATION MANUAL - CONTENTS