Figure. 7.9.1.2. - 221. Fastening the coulter
2. Set the lowest dampening rubber (4) in place and lift the coulter (1) against the mounting
beam.
3. Install the remaining three dampening rubbers (5).
4. Replace the mounting plate (3).
5. Install the 4 mounting bolts and nuts (2) and tighten the bolts evenly to eliminate any
gap between the mounting plates.
Use new locking nuts with a strength rating of 10 when mounting.
Figure. 7.9.1.2. - 222. Mounting the coulter cylinder
6. Insert the bottom cylinder bolt M20 X 75 (1) in the coulter mounting hole with the
bushing.
Use new locking nuts to fasten.
The bushing in the foremost coulter (3) is in the centremost hole. In the rearmost
coulter (2) the bushing is found in the rearmost hole.
Operation and maintenance manual
FX300 and FX400 Comfort
1.00
164 (189)
Summary of Contents for FX300 Comfort
Page 181: ...Hydraulic schematics FX300 and FX400 1 Hydraulic schematics FX300...
Page 182: ...Hydraulic schematics FX300 and FX400 2...
Page 183: ...Hydraulic schematics FX300 and FX400 3 Hydraulic schematics FX400...
Page 184: ...Hydraulic schematics FX300 and FX400 4...
Page 185: ...Electrical schematics FX300 and FX400 Comfort 1 Electrical schematics...
Page 186: ...Electrical schematics FX300 and FX400 Comfort 2...
Page 187: ...Electrical schematics FX300 and FX400 Comfort 3...