99
Chapter 6 - Operating Procedures
If you have any problems in performing these procedures, contact the
Tech Support department for assistance, refer to Chapter 8.
Test Cable
Internal Composite
Connector
MultiMux
MultiMux
Using the Test Cable
Using the Composite Link Loopback Cable
MultiMux
MultiMux
Internal Composite
Connector
Composite Link
Loopback Cable
Note: Used locally before installation to verify operation of
entire system except compolsite link.
Note: Initiate Downline Load must be off for loopback testing.
Figure 7-1 Off Line Test Modes
Summary of Contents for MMH900
Page 1: ...MMH900 Series Statistical Multiplexer User Guide...
Page 7: ...Chapter 1 Introduction Description...
Page 26: ...Chapter 2 Configuration...
Page 33: ...Chapter 3 Front Rear Panel Descriptions...
Page 44: ...Chapter 4 Installation...
Page 51: ...Chapter 5 Commands...
Page 89: ...Chapter 6 Operating Procedures...
Page 96: ...Chapter 7 Troubleshooting...
Page 111: ...Chapter 8 Service Warranty Technical Support...
Page 116: ...Appendices...
Page 184: ...Glossary...
Page 193: ...Glossary 193 X Y Z...
Page 200: ...S000315A...