Section 2
Installation Instructions
Part Number 020002115
10/11
2-7
Water and Syrup Lines
CARBONATED WATER LINES
•
Unit requires connection of two (2) carb water lines,
(1/2" barb) one for each flex manifold and also
completes the carbonated water system.
•
Strip back the insulation on the conduit and route
through the hole in counter top. Directly connect the
lines to the left and right manifolds.
PLAIN WATER LINES
•
Unit requires connection of two (2) plain water lines,
one for each flex manifold. 3/8" barb on end of check
valve (required for code). Use parts from installation
kit (2x2" black stripped 3/8" tube and 3/8" x 1/2" barb
adapter)
•
Strip back the insulation on the conduit and route
through the hole in counter top. Directly connect the
lines to the left and right manifolds.
SYRUP LINES
•
The eight (8) valve unit has eight (8) syrup lines, Four (4)
for the left manifold and four (4) for the right manifold.
The ten (10) valve unit has ten (10) syrup lines, five (5)
on the left and five (5) on the right. All 3/8" barb fittings.
For 1/2" conduit syrup tubes (up to three (3)) use parts
from the installation kit. (3"x2" orange, green, white
stripped 3/8" tubes and 3/8" barb adapters) to connect 3/
8" barb to 1/2" syrup conduit tubes.
•
Strip back the insulation on the conduit and route through
the hole in counter top. Directly connect the lines to the
left and right manifolds.
•
FULLY INSULATE (no air gaps) and finish with tape
wrap, all tubing from the flex manifolds to the conduit
bundle insulation. All tubing must be insulated and air
tight.
Drainage Options
90° Elbow Fitting
Radiator Clamp
Flexible Tubing
Straight Fitting
Radiator Clamp
Flexible Tubing
Rear Access for Drain
Hose and Beverage Lines
Drainage Through Bottom
Drainage Through Back
Rear View
Summary of Contents for S250M 10
Page 29: ......