Installation Instructions
Section 2
2-2
Part Number 020002115
10/11
Pre-installation Checklist
When installing any system, first make sure the major components are available. Generally the major components
necessary for an installation are:
B-I-B SYSTEM ALSO:
POST MIX SYSTEM:
BULK SYRUP SYSTEM ALSO:
DOUBLE CHECK:
ALSO CONSIDER:
B-I-B connectors
B-I-B regulator set
B-I-B rack
B-I-B syrup boxes
CO
2
regulator set
Beverage dispenser
Beverage tubing
CO
2
tank
Carbonator
Stepless (Oetiker) clamps
Chain for CO
2
tank
Syrup connectors for Bulk tank
Gas connectors for Bulk tank
Bulk syrup tanks
Do you have enough space to install the
dispenser or a dispenser and top mounted
cuber?
Does top mounted cuber (if utilized) have a
minimum of 6 inches (15.3 cm) clearance on all
sides?
Is the countertop level?
Can the countertop support the weight of the
dispenser, or the dispenser/cuber combination
plus the weight of the stored ice?
Water line
Drain
Power outlet
Heating and air conditioning ducts