background image

 

1

 

 

 
 
 

 

 
 

ADIR Semi 

 Automatic 

2”

-

3” filters

 TDS 

 

Installation and maintenance instructions

 

Box contents 

 

Main filter body 

 picture

 

1

 

 

 

Flush valve 2" FF 

 picture 2 

 

Flush valve 1/2" FM 

 picture 3 

 

Pressure indicator kit 

 picture 4 

o

 

Pressure indicator. 

o

 

6 mm tube length 20cms (long). 

o

 

6 mm tube length 15cms (short). 

o

 

2 Female threaded couplers 6 mm 

o

 

2 connectors 1/4"M to 6 mm elbow 

o

 

1 connector 1/4"F to 6 mm elbow 

o

 

1 connector 1/4"F to 6 mm adaptor 
 

 

Assembly  

 

Connect the 2” flush valve to the bottom of the filter cup, 

(no need to use Teflon, valve is self-seal). 

Make sure handle open position is away from filter cup. 

 

Connect the ½” flush valve to the 

flush screen outlet, (no 

need to use Teflon, valve is self-seal). 

 

Pressure indicator: 

o

 

Connect two 1/4"F couplers to filter body top 

outlets. 
Connect two elbow 1/4"M to the couplers. 

o

 

Connect elbow 1/4"F to the bottom of the 

indicator. 

o

 

Connect 1/4"F adaptor to side of the indicator. 

o

 

Press fit the indicator to the slots on the filter 
body.  

o

 

Connect long 20cms tube from Filter inlet port to 
indicator bottom (marked "+"). 

o

 

Connect long 15cms tube from Filter outlet port 
to indicator side (marked "-"). 

o

 

Hydraulic fitting may require Teflon to seal. 

 

Filter is ready for installation 

 picture 5 

 

Installation 

 

Filter can be installed in vertical position or at 90° to the 
pipe, (Flush valve pointing down or to the side). 

 

Ensure proper flow direction as clearly marked on the 

filter. 

 

Make sure both flush valves are closed. 

 

It is recommended to install a shut off valve before the 

filter for maintenance. 

 

Filter is ready for first operation 
 

 

 
 

 

 

Picture 1  

 

 

 

Picture 5

 

 

 

950mm 

795mm 

235mm 

 

 

Picture 2 
 

 

Picture 3 

 

Picture 4

 

Reviews: