M
UGNAI N I
®
MUGNAINI SERIES
GAS FIRED OVEN MANUAL
Mugnaini Imports, Inc.
11 Hangar Way, Watsonville CA 95076
888.887.7206 │ 831.761.7167 │ Fax: 831.728.5570
www.mugnaini.com │ [email protected]
PAGE 7
30”
30”
36”
Non-combustible
floor or floor covering
Oven front
1/2” Concrete board
Wood stud
Metal stud
1” Min
1” Min
1” Min
3. CLEARANCES AND FACADES
3.1 SETTING THE OVEN
Secure oven to floor with four [4] fasteners a minimum of 3/8” diameter. Insert at least one fastener,
appropriate for the floor, per steel mounting foot embedded 2 ½” minimum.
3.2 CLEARANCES TO COMBUSTIBLE CONSTRUCTION
The oven requires a 1” clearance on back wall and side walls to any combustible materials. Do not pack
the air gap with insulation or other material. You may bridge the gap between the oven and façade wall
with metal stud framing and concrete board. A metal stud may be fastened directly to the steel sides of
the oven. Use ½” Durock brand concrete board,or similar, to transition to any wood framing.
Clearances to Combustible Construction